Royaume-Uni – Réparation de câble dans le parc éolien en mer de Walney

Cable repair Offshore wind farm Walney

Walney Offshore Wind Farm Cable repair

For the repair works of the export cable of the Walney Offshore wind farm project, Jan De Nul Group mobilised the jack-up installation vessel Taillevent.

Client Dong Energy Wind Power A/S was looking for a stable work platform with enough space on deck to carry out the repairs at a water depth of more than 60 metres.