Excavation, asphalting and foundation works were carried out to prepare for the construction of 12 bridges. This project was a tour de force of civil engineering by Jan De Nul Group. This gigantic undertaking included connecting two 6,000-tonne bridges and two 8,000-tonne bridges all over one weekend. This feat was only possible thanks to Jan De Nul Group’s knowledge and its extensive fleet of modern equipment.