SNIM iron ore port of Nouadhibou
In total, Jan De Nul Group removed approximately 21.6 million m³ sediments and transported them to a designated location at sea. To dredge and remove such considerable volumes within the 12-month deadline, suction cutter Zheng He and trailing suction hopper dredger Leiv Eiriksson will be deployed simultaneously. The Zheng He will pre-cut the sandstone, and then the Leiv Eiriksson will dredge the sediments and dump them at sea. In 2018, we received the DPC Innovation Awards for this efficient work method.