Liepaja Port Water Infrastructure Works
Jan De Nul Group deepened the access channel from 12.5 metres to 14.5 metres and created a new 14-metre deep shipping channel to one of the main bulk terminals in the harbour area. In total, we dredged 2.7 million m³ sediments. Difficult weather conditions and a heterogeneous subsoil made this a highly challenging project. However, we managed to complete the project in less than 9 months, one and a half months earlier than planned.