MALT
PSR, subsidiary of Jan De Nul Group, and CODIC reached the highest construction point of the MALT site in Mechelen.
Pompoenplanting gevangenis Antwerpen
Jan De Nul Group and EEG Group made good progress: the site reached its highest point. That milestone was symbolically celebrated with a pumpkin planting.
COTU
100 Antwerp students rolled up their sleeves at our Scheldt tunnel site last week.
Kraan
A new step in the transition to building sustainably with renewable energy.
COTU
Since January 2023, we have been building the eight gigantic elements for the Scheldt Tunnel (Antwerp) in a large construction dock in Zeebrugge.
Veiligheidsdag
Veiligheid staat centraal bij alles wat we doen, zowel aan boord als op de werven van onze bouwprojecten.
ViA12
The intersection will have conflict-free crossings thanks to the deepening of the A12 and the construction of bridges, ensuring smoother and safer traffic.
OverBruggen
TM Brugfabriek, a collaboration between Jan De Nul, Willemen and Artes, will replace 49 fixed bridges in Flanders on an accelerated basis in one package.
Montevideo
Discover what dream you can make come true in our latest e-magazine Focus.