Palm Cove Canal, Dubai
Palm Cove Canal
Jan De Nul Group’s assignment mainly consisted of three parts: dry excavation of a 6 km long canal, shore protection with riprap, and installation of retaining walls. In total, we excavated 5 main basins, 200 m wide. For this, we dug out more than 8 million m3 rock material, which we reused onshore and offshore. We protected the south side of the canal with a 5 km long rock revetment of 1 million tonnes of rock in total. On the north side, we built 9 km of concrete retaining walls. With this project, Jan De Nul Group accessed the new segment of dry civil engineering works in Dubai.