Search results
Displaying 521 - 540 of 835 resultsIn 2016-2017 the ‘Joseph Plateau’ was mobilized to the Port of An Ping to execute one of the largest scopes the vessel has executed so far. The vessel installed
Between the mainland of China and the island of Hainan, four 500 kV cables were installed by Prysmian which were protected with filter and armour rock by the
Two submarine cables with a length of over 100 km have been installed between the island of Jindo and the island of Jeju, located in the south of South Korea
Information market, 3 June 2019| Free entrance between 6 and 9 pm.
The Beatrice site covers an area of up to 130 km² and consists of 84 offshore wind turbines with a total capacity of 588 MW and two High Voltage Alternating
Gunfleets Sands OWF is a 172 MW wind farm about 7 km off the coast in south of the United Kingdom. The OWF was constructed by Dong (now Orsted) between 2008 and
The Vincent FPSO is a converted VLCC moored offshore the North West Cape, Australia
This large construction project in Monaco started in 2016 which consisted of the development of a recreational and housing extension of the principality in
Het Ula-veld ligt in het midden van de Noordzee, centraal tussen Noorwegen, het Verenigd Koninkrijk, Denemarken en Nederland. Maersk Drilling plande een
Sunday 28 April 2019 | Between 10 am and 5 pm | Zuidkaai 2 in Izegem (Belgium)
Jan De Nul Group continues to sail a steady course, combining solid financial figures with targeted investments.
De sleephopperzuiger Charles Darwin baggerde in totaal 13 miljoen m³ zand op 1,5 uur vaarafstand van de luchthaven van Brisbane.
Jan De Nul Group dredged a 42 km waterway in the Port Hedland harbour and ensured a safe and sustainable access to the harbour. In order to achieve this, we
The group can continue to make a difference in what is expected to be a continued volatile market conditions. This is clearly shown by our increasing order book
Jan De Nul Group has revealed its commitment to reduce CO₂ emissions by 15% a year during maintenance dredging works at the Nieuwpoort coastal marina.
Jan De Nul Group launched its fourth Ultra-Low Emission vessel last week in Singapore. It concerns the 6,000 m³ Trailing Suction Hopper Dredger Sanderus.
The construction of the new Grand Hospital of Charleroi was kicked off on Friday 26 April 2019 in Gilly.
Three Water Injection Dredgers to extend the versatile fleet of Jan De Nul Group.