Search results

1685 search results found.
Every building needs a builder as its father and a designer as its mother. That is why Jan De Nul, together with engineer and architect Dr Philippe Samyn M Sc.,
Jan De Nul will be in charge of the design, installation, burial and protection of two cable clusters of almost 1,000 km in total, connecting the islands Al Ghallan and Das in the Arabian Gulf to the onshore converter stations at Al Mirfa and Shuweihat in Abu Dhabi (UAE).
For the offshore wind farm Vesterhav Nord & Syd in Denmark, Jan De Nul Group will transport and install a total of 41 wind turbines of 8.4 MW each on behalf of Vattenfall Denmark. All together, these turbines will produce enough green electricity for the annual needs of approximately 380,000 Danish households. Jan De Nul’s jack-up installation vessel Vole au vent will be mobilised for this installation project.
Dogger Bank Wind Farm and Jan De Nul Group announce the signing of the final contract for the transport and installation of the GE Haliade-X offshore wind turbines at Dogger Bank A and Dogger Bank B, 130 km off the Yorkshire coast, starting in 2023. Turbine delivery and installation at the first two phases of Dogger Bank Wind Farm will be the first assignment for the world’s largest Offshore Jack-Up Installation Vessel owned by Jan De Nul Group, the Voltaire.
30 years of Disneyland Paris, you must experience it!
People Jan De Nul Group