Search results

1685 search results found.
The Scheldt Tunnel forms the royal piece of Antwerp's Easterweellink. This closes the ring around the port city.
Jan De Nul enlarges the tourist beach of Balneário Camboriú over a total distance of 5.8 km.
We installed subsea power cables to bring green energy produced in the Netherlands ashore.
We transformed the heavily polluted Fort Sint-Filips site in the port of Antwerp into a thriving biotope by encapsulating the contamination and constructing flood protection.
The Oskarshamn harbour basin was one of the most polluted basins in Sweden. After cleaning the seabed and remediating the contaminated sludge, the port is welcoming trade again.
Het Coastal Virginia offshore windproject is pas het tweede offshore windproject in Amerikaanse federale wateren. We installeerden en transporteerden twee funderingen en windturbines.
We carry out innovative construction projects and breathe new life into contaminated sites to shape the land we live on.
For the repair works of the export cable of the Walney Offshore wind farm project, Jan De Nul Group mobilised the jack-up installation vessel Taillevent.
In 2024 we completed the installation of 107 foundations for two wind farms in the German North Sea, “Gode wind 3” and “Borkum Riffgrund 3”.
We built a 50-hectare mangrove island from scratch, using locally dredged material. AquaForest is a blueprint for mangrove restoration worldwide.
We use groundbreaking technological and nature-based solutions to respond to actual challenges and anticipate the future ones.
We use groundbreaking technological and nature-based solutions to respond to actual challenges and anticipate the future ones.
We use groundbreaking technological and nature-based solutions to respond to actual challenges and anticipate the future ones.
We minimise emissions, boost biodiversity, think circular and connect communities to leave a positive mark with our projects.