Search results

1685 search results found.
In the cold North of Russia, Jan De Nul Group has been playing a crucial role for many years in the building of a complete onshore LNG plant and harbour. The first LNG plant above the northern polar circle is a true world premiere. In 2012 and 2013, the first phases of the access channel to the future LNG site and the harbour basin were dredged. In 2016, we mobilised no less than 18 dredgers to dredge 16.8 million m³ over a 12-week period. This included a good deal of permafrost. And we only had three critical months to achieve this, because then the route to civilisation irrevocably freezes up again until the next year.
Taiwan is a country that never sleeps and consumes a lot of electricity. Therefore, it needs stable power supply. To guarantee this supply, power plants must be able to run at full capacity, and this is only possible if they can ship in enough coal. To maximise coal supply, contracting authority Taiwan Power Company needed to deepen the harbour at Linkou. Jan De Nul Group was awarded the contract.